Onyx Dynamic Balancing Services

Onyx Dynamic Balancing Services

Dwarka, New Delhi, Delhi
GST No. 07AMIPS1756P2Z9
TrustSEAL Verified
Call 0804896437178% Response Rate
SEND EMAIL
 

About Us

Established in the year 1996, located in New Delhi, India, we “Onyx Dynamic Balancing Services”, are a well-known service provider, exporter, trader, and wholesaler of Vibration Analysis, Dynamic balancing, Condition Monitoring and Thermography. Besides, we also offer Ultrasonic Flaw Detection, MPI and DPI to the Sugar, Cement, Chemical and many other Manufacturing Industries. Besides, with our advanced methodology, we are able to render these services within client's budget. We offer PDM instruments and balancing services, dynamic balancing services like vibration meters, vibration data collectors, balancing machine, ultrasonic flaw detection, ultrasonic flaw detectors and magnetic particle inspection etc.

Apart from these, we also manufacture these instruments MPI & DPI Consumables, Sound Measuring Devices, Thermal Imaging Cameras, IR Temperature, Measuring Instruments, Stroboscope and Tachometers. To conduct vibration analysis and ultrasonic flaw detection needs tremendous skill and sound knowledge, which comes with the in-depth experience in the domain. Owing to possess all these abilities, our expert engineers are able to offer the quality services. Our expert team members accurately diagnose and provide the complete solution to manufacturing industries by offering them specific machines as per the application.

We are headed by our mentor, "Mr. Vinay Sharma" who has in-depth knowledge in this domain. Owing to his rich experience and efficient guidance, we are able to maintain a renowned position for ourselves in this domain. He is the person whose leadership has always motivated us to accomplished the undertaken projects on time.

Company Factsheet


Basic Information

Nature of Business
Exporter and Service Provider
Additional Business
  • Manufacturer
  • Wholesaler
  • Trader
  • Exporter
Company CEO
Vinay Sharma
Registered Address
Office No. 234, Second Floor, Vardhman City Mall, Sector 23, Dwarka, New Delhi- 110077, Delhi, India
Total Number of Employees
Upto 10 People
Year of Establishment
1996
Legal Status of Firm
Individual - Proprietor
Annual Turnover
Rs. 50 Lakh - 1 Crore
Trade & Market
Export Percentage
upto 20%
Infrastructure
Location Type
URBAN
Building Infrastructure
Permanent
Size of Premises
110 square feet
Statutory Profile
Import Export Code (IEC)
05100*****
Tan No.
DELV1*****
Banker
  • UNION BANK OF INDIA
GST No.
07AMIPS1756P2Z9
Packaging/Payment and Shipment Details
Payment Mode
  • Cash
  • Credit Card
  • Cheque
  • DD
Shipment Mode
  • By Air
  • By Road
  • By Cargo
We Send You The Quotation Immediately
Get Instant Quote

Why Us?

Below mentioned factors have enabled us in becoming the foremost choice of our clients:

  • High-quality PDM Instruments and Dynamic Balancing Services
  • Well equipped infrastructure
  • Experienced team of professionals
  • Affordable prices
  • Timely delivery
    For more Information:Contact Us

    Infrastructure

    Backed by state-of-the-art infrastructure, we have been able to meet our production targets on time. Spread across a sprawling area, our infrastructure is well equipped with modern machinery and equipment that enable us to deliver instruments in an efficient manner. Further, our team of skilled professionals also make sure that all the installed machines are regularly upgraded to ensure high efficiency.

     



    In order to carry our manufacturing process in a hassle-free manner, we have divided our infrastructure into different units like:

    • Manufacturing unit
    • Production unit
    • Quality testing unit
    • Research and development unit
    • Warehousing & packaging unit

       


      All the units are handled by a well-qualified team member who efficiently manage all the process involved.

      For more Information:Contact Us

      Our Team

      Assisted by a team of diligent engineers and technicians, we are able to meet the varied demands of clients in an effective manner. Well versed in the technological advancement, all our team members are highly competent to take new challenges. Each of our members abides by all rules and regulations and work round the clock to offer PDM Instruments and Dynamic Balancing Services with specified customization for our clients.

       



      Our team comprises:

      • Engineers
      • Technicians
      • Quality controllers
      • Research & development personnel
      • Sales & marketing executives

         


        All the above-mentioned team members work in close co-ordination with each other and help us in being at par with our competitors in the market.

        For more Information:Contact Us

        Brands We Deal In

        We deal in the brand Base line.
        For more Information:Contact Us

        Domain Expertise

        Owing to our in-depth experience of 14 years, we are able to offer our clients quality instruments and services in a timely manner. To meet the exact requirements of our clients it is very necessary to possess the sound knowledge of the domain. Our expert engineers and technicians are able to meet the expectation of clients in this field. With the untiring efforts and combined expertise of our qualified team members, we have been able to maintain a remarkable position in this domain.

         



        Moreover, we follow these working principles while rendering our services:

        • To serve our clients with honesty
        • Ability to provide industry specific instruments
        • Hassle free service without delay
        • Ethical & transparent service
          For more Information:Contact Us

          Infrastructure Facilities

          • Office Image
          For more Information:Contact Us
          Infrastructure Facilities

          Our Vendor Base

          • Our Warehouse
          For more Information:Contact Us
          Our Vendor Base

          Predictive Maintenance

          There are many advantages of using a predictive maintenance program. A well-orchestrated predictive maintenance program will all but eliminate catastrophic equipment failures. Staff will then be able to schedule maintenance activities to minimize or eliminate overtime costs. And, inventory can be minimized, as parts or equipment will not need to be ordered ahead of time to support anticipated maintenance needs. Equipment will be operated at an optimal level, which will also save energy costs and increase plant reliability.

          Past studies have estimated that a properly functioning predictive maintenance program can provide a savings of 8% to 12% over a program utilizing preventive maintenance strategies alone. Depending on a facility's reliance on a reactive maintenance approach and material condition, savings opportunities of 30% to 40% could easily be realized.

          In fact, independent surveys indicate the following industrial average savings resulted from initiation of a functional predictive maintenance program:
          • Return on investment: 10 times
          • Reduction in maintenance costs: 25% to 30%
          • Elimination of breakdowns: 70% to 75%
          • Reduction in downtime: 35% to 45%
          • Increase in production: 20% to 25%

           


          Advantages of predictive maintenance:

          • Provides increased component operational life and availability
          • Allows for preemptive corrective actions
          • Results in decrease in equipment and/or process downtime
          • Lowers costs for parts and labor
          • Provides better product quality
          • Improves worker and environmental safety
          • Raises worker morale
          • Increases energy savings
          • Results in an estimated 8% to 12% cost savings over which might result from a predictive maintenance program
          For more Information:Contact Us

          Advantages of Predictive Maintenance

          There are many Advantages of the Predictive Maintenance program. A well-orchestrated predictive maintenance program will all but eliminate catastrophic equipment failures. Staff will then be able to schedule maintenance activities to minimize or eliminate overtime costs. And, inventory can be minimized, as parts or equipment will not need to be ordered ahead of time to support anticipated maintenance needs. Equipment will be operated at an optimal level, which will also save energy costs and increase plant reliability.

          Past studies have estimated that a properly functioning predictive maintenance program can provide a savings of 8% to 12% over a program utilizing preventive maintenance strategies alone. Depending on a facility's reliance on a reactive maintenance approach and material condition, savings opportunities of 30% to 40% could easily be realized.

          Advantages of predictive maintenance:
          • Provides increased component operational life and availability
          • Allows for preemptive corrective actions
          • Results in decrease in equipment and/or process downtime
          • Lowers costs for parts and labor
          • Provides better product quality
          • Improves worker and environmental safety
          • Raises worker morale
          • Increases energy savings
          • Results in an estimated 8% to 12% cost savings over which might result from a predictive maintenance program

           


          In fact, independent surveys indicate the following industrial average savings resulted from initiation of a functional predictive maintenance program:

          • Return on investment: 10 times
          • Reduction in maintenance costs: 25% to 30%
          • Elimination of breakdowns: 70% to 75%
          • Reduction in downtime: 35% to 45%
          • Increase in production: 20% to 25%
          For more Information:Contact Us

          Inspection Steps

          Pre-Cleaning:
          The test surface is cleaned to remove any dirt, paint, oil, grease or any loose scale that could either keep penetrate out of a defect or cause irrelevant or false indications. Cleaning methods may include solvents, alkaline cleaning steps, vapor De-greasing or media blasting. The end goal of this step is a clean surface where any defects present are open to the surface, dry, and free of contamination. Note that if media blasting is used, it may "work over" small discontinuities in the part, and an etching bath is recommended as a post-bath treatment.

          Applications of Penetrate:

          The penetrate is then applied to the surface of the item being tested. The penetrate is allowed time to soak into any flaws (generally 5 to 30 minutes). The dwell time mainly depends upon the penetrate being used, material being testing and the size of flaws sought. As expected, smaller flaws require a longer penetration time. Due to their incompatible nature one must be careful not to apply solvent-based penetrate to a surface which is to be inspected with a water-washable penetrate.

          Excess Penetrate Removal:

          The excess penetrate is then removed from the surface. Removal method is controlled by the type of penetrate used. Water-washable, solvent-removable, lipophilic post-emulsifier or hydrophilic post-emulsifier are the common choices. Emulsifiers represent the highest sensitivity level, and chemically interact with the oily penetrate to make it removable with a water spray. When using solvent remover and lint-free cloth it is important to not spray the solvent on the test surface directly, because this can the remove the penetrate from the flaws. This process must be performed under controlled conditions so that all penetrate on the surface is removed (background noise), but penetrate trapped in real defects remains in place.

          Inspection:

          The inspector will use visible light with adequate intensity (100 foot-candles is typical) for visible dye penetrate. Ultraviolet (UV-A) radiation of adequate intensity (1,000 micro-watts per centimeter squared is common), along with low ambient light levels (less than 2 foot-candles) for fluorescent penetrate examinations. Inspection of the test surface should take place after a 10 minute development time. This time delay allows the blotting action to occur. The inspector may observe the sample for indication formation when using visible dye. Also of concern, if one waits too long after development the indications may "bleed out" such that interpretation is hindered.


          Post Cleaning:

          The test surface is often cleaned after inspection and recording of defects, especially if post-inspection coating processes are scheduled.
          For more Information:Contact Us
          X
          zoomup




          Reach Us
          Vinay Sharma (Proprietor)
          Onyx Dynamic Balancing Services
          Office No. 234, Second Floor, Sector 23
          Dwarka, New Delhi - 110077, Delhi, India


          Call Us


          Send E-mail